CVS Cafetorium & Existing Cafeteria Conversion
Divider
Background: When C.V. Starr Intermediate School was originally constructed in 1998, the building excluded a large meeting space (auditorium) and included a cafeteria that was not sufficient to accommodate an entire grade. These deficiencies present significant scheduling and supervision challenges when developing student schedules based on meal serving restrictions, rather than programmatic needs.
Project Highlights: Cafetorium Addition of 13,400 sq ft & Existing Cafeteria Renovation
- Cafetorium to act as cafeteria with capacity for an entire grade or as an auditorium with capacity for over 500 seats
- Flexible space on the stage to operate as a Music Room for instrumental lessons, chorus, or general music classes
- Includes additional student lavatories, kitchen, offices, and storage
- Construction efficiency: foundation would be reinforced in order to accommodate a second-floor classroom addition in the future, if ever necessary
- Construction efficiency: flexibility provided by Cafetorium stage equipped with foldable partition, which allows for operation as one (1) Music classroom
- Converts the existing Cafeteria into two (2) classrooms and one (1) Small Group Instruction (SGI) room
Educational Benefit: The Cafetorium addition and conversion of the existing cafeteria would allow CVS to:
- Reduce class sizes by recovering two (2) full-sized classrooms from the existing cafeteria conversion and one (1) Music Classroom through flexible-use stage design
- Host concerts, grade-level assemblies, and programs without interfering or conflicting with WMS activities
- Support large-space adaptive physical education classes and team learning activities
- Provide for the repurposing of an existing Music classroom, which would further reduce class sizes and/or be used for reading/math interventionists and OT/PT (if Cafetorium stage is used for Music instruction)
Financial Profile: Depending on the nature of the work performed, the cost of the project will be financed by a capital improvement bond repaid over a period of 15-20 years. Similar to a home mortgage, this spreads the payment out over the useful life of the improvements and minimizes the impact on the taxpayer.
| Total Estimated Project Costs | $18.4M | 100% |
| Estimated NY State Building Aid | $2.6M | 14% |
| Brewster's Estimated Portion | $15.8M | 86% |
| Less: Capital Funds On-Hand | <$12.0M> | <65%> |
| Brewster's Estimated Net Portion | $3.8M** | 21% |